Project MNE 3 is a high-potential solar photovoltaic initiative in Nikšić, Montenegro, designed to generate 34 MW of clean energy. Strategically positioned in a region with excellent solar resources and well-established energy infrastructure, this project provides an attractive opportunity for investors looking to participate in Montenegro’s growing renewable energy sector. With secured land ownership, proximity to major transmission lines, and a streamlined development process, Project MNE 3 is well-positioned to contribute to the country’s energy transition.
Installed Power: 34 MW DC
Projected Annual Energy Output: 43.5 GWh
Total Land Area: 294,559 m²
Land Ownership: Owned by the project developer
Altitude: 883 meters, optimizing system efficiency
Average Solar Irradiation: 1,738.8 kWh/m²/year
Grid Connectivity: 110 kV, 220 kV, 410 kV infrastructure, located 2 km from the nearest substation
Development Status: In Progress
Located in Nikšić, a pivotal area for Montenegro’s renewable energy expansion, Project MNE 3 benefits from an optimal solar profile and close proximity to key energy infrastructure. The site is strategically positioned near three major transmission lines (110 kV, 220 kV, 410 kV), ensuring strong grid connectivity and minimal transmission losses.
The project also benefits from asphalt road access, facilitating efficient construction and operational logistics. However, there is currently no connection to the municipal water supply, which may require additional infrastructure investments.
Montenegro is committed to EU sustainability targets, creating a favorable regulatory landscape for large-scale solar investments. Project MNE 3 aligns with this vision, offering investors a strong foothold in the market.
Land fully owned by the developer, reducing acquisition risks.
Attractive energy tariffs and Power Purchase Agreement (PPA) opportunities ensure stable returns.
High efficiency: 1,480.8 kWh/kWp specific PV output
Optimal module tilt: 36° for maximum energy absorption
Favorable climate conditions: An average temperature of 10.8°C minimizes system heat stress, ensuring long-term efficiency.
Close proximity to major grid infrastructure, minimizing integration costs.
Existing road access, facilitating streamlined project development and operation.
Feasibility Study: Completed
Land Ownership: Secured
Urban-Technical Conditions: Fulfilled
Next Milestones: Permit acquisition and construction commencement
Perun Energy is among Montenegro’s most experienced solar project developers, with a track record of successfully navigating regulatory, technical, and logistical challenges. The company’s expertise in renewable energy infrastructure development ensures that Project MNE 3 will be delivered efficiently and to the highest industry standards.
Investors in Project MNE 3 will benefit from Montenegro’s growing demand for clean energy, favorable investment climate, and strong policy support for renewable projects.
We welcome partners across various financing structures, including equity investment, co-development, and Power Purchase Agreements (PPAs). These models provide investors with long-term revenue stability and a strategic entry point into Montenegro’s expanding renewable energy sector.
For investment inquiries, technical documentation, or financial projections, contact us at management@perun.energy for more details.
Month | DNI (kWh/m²) | Temperature (°C) |
January | 95.8 | 4.2 |
February | 101 | 5.3 |
March | 131 | 8.3 |
April | 125.5 | 12.1 |
May | 154.3 | 16.5 |
June | 185.2 | 20.4 |
July | 212.5 | 23.8 |
August | 190.3 | 23.1 |
September | 137.1 | 18.4 |
October | 122.5 | 13.2 |
November | 86.4 | 8.0 |
December | 86.5 | 4.9 |
Month | Expected Energy Production (MWh) |
January | 3,300 |
February | 3,600 |
March | 4,200 |
April | 4,000 |
May | 5,000 |
June | 5,900 |
July | 6,500 |
August | 6,100 |
September | 4,600 |
October | 4,200 |
November | 3,300 |
December | 3,100 |
Specification | Details |
---|---|
Installed Capacity | 34 MW DC |
Nominal Power Output | 30.8 MW AC |
Estimated Energy Yield | 43.5 GWh |
Elevation | 883 meters |
Grid Voltage | 110 kV |
Distance to Grid | 2 km |
Land Ownership | Developer-owned |