PROJECT Details

50 MW

project for installed solar power

Over 65 GWh

Annual Energy production

454,454

square meter of land

Project MNE 5 is a large-scale solar photovoltaic initiative in Danilovgrad, Montenegro, designed to generate 50 MW of clean, renewable energy. With optimal solar irradiation, a secured 30-year land lease, and direct access to Montenegro’s energy infrastructure, this project presents a compelling investment opportunity. As Montenegro continues its transition toward renewable energy, Project MNE 5 is positioned to play a vital role in the region’s sustainable energy future.

Key Project Metrics

  • Installed Power: 50 MW DC

  • Projected Annual Energy Output: 65.7 GWh

  • Total Land Area: 454,454 m²

  • Land Lease Term: 30 years

  • Altitude: 616 meters, optimizing system efficiency

  • Average Solar Irradiation: 1,701.4 kWh/m²/year

  • Grid Connectivity: 110 kV infrastructure

  • Development Status: In Progress

Strategic Location & Infrastructure

Located in Danilovgrad, one of Montenegro’s key regions for renewable energy, Project MNE 5 benefits from a strong solar profile and proximity to major transmission lines, ensuring efficient energy distribution and reliable grid integration.

The project has macadam road access, which may require improvements for large-scale logistics and construction. Additionally, there is no connection to the municipal water supply, which may require further infrastructure development.

Investment Rationale

1. Expansion of Renewable Energy Capacity

Montenegro is actively progressing toward EU sustainability targets, creating a favorable investment climate for large-scale solar projects. Project MNE 5 is well-positioned to contribute to the country’s renewable energy portfolio.

2. Long-Term Revenue Stability

  • 30-year secured land lease, reducing acquisition risks.

  • Opportunities for Power Purchase Agreements (PPAs) ensure stable returns over the project’s lifetime.

3. Optimized Photovoltaic Performance

  • High efficiency: 1,480.8 kWh/kWp specific PV output

  • Optimal module tilt: 36° for maximum energy absorption

  • Favorable climate conditions: An average temperature of 10.8°C minimizes system heat stress, ensuring long-term efficiency.

4. Grid & Infrastructure Readiness

  • Proximity to a strong grid infrastructure, ensuring seamless energy transmission.

  • Existing road access, with opportunities for infrastructure enhancements to support efficient logistics and operations.

Project Development Status

  • Feasibility Study: Completed

  • Land Lease Agreements: Finalized

  • Urban-Technical Conditions: Fulfilled

  • Next Milestones: Permit acquisition and construction commencement

Why Invest in Project MNE 5?

Perun Energy is among Montenegro’s most experienced solar project developers, with expertise in regulatory compliance, engineering solutions, and financial structuring. The company’s track record ensures that Project MNE 5 will be executed efficiently, maximizing return on investment.

Investors in Project MNE 5 will benefit from Montenegro’s growing demand for clean energy, stable investment climate, and strong government support for renewables.

Investment & Partnership Opportunities

We welcome partners across various financing structures, including equity investment, co-development, and Power Purchase Agreements (PPAs). These models provide investors with long-term revenue stability and a strategic entry point into Montenegro’s expanding renewable energy sector.

Contact Us

For investment inquiries, technical documentation, or financial projections, contact us at management@perun.energy for more details.

 

Average Monthly Weather Statistics

Climatic & Energy Yield Data

MonthDNI (kWh/m²)Temperature (°C)
January95.84.2
February1015.3
March1318.3
April125.512.1
May154.316.5
June185.220.4
July212.523.8
August190.323.1
September137.118.4
October122.513.2
November86.48.0
December86.54.9
Monthly Energy Production Data

Monthly Energy Output Projections

MonthExpected Energy Production (MWh)
January4,900
February5,400
March6,300
April6,100
May7,400
June8,700
July9,500
August8,900
September6,800
October6,300
November5,100
December4,800
Specifications

Technical Specifications

SpecificationDetails
Installed Capacity50 MW DC
Nominal Power Output44.1 MW AC
Estimated Energy Yield65.7 GWh
Elevation616 meters
Grid Voltage110 kV
Lease Duration30 years

 