Executive Summary

Project MNE 4 is a large-scale solar photovoltaic initiative in Nikšić, Montenegro, designed to generate 55 MW of clean, renewable energy. With optimal solar irradiation, a secured 30-year land lease, and strong connectivity to Montenegro’s energy infrastructure, this project presents a compelling investment opportunity. As Montenegro continues its transition toward renewable energy, Project MNE 4 is positioned to become a valuable contributor to the region’s energy mix.

Key Project Metrics

  • Installed Power: 55 MW DC

  • Projected Annual Energy Output: 69.1 GWh

  • Total Land Area: 527,617 m²

  • Land Lease Term: 30 years

  • Altitude: 931 meters, optimizing system efficiency

  • Average Solar Irradiation: 1,705.7 kWh/m²/year

  • Grid Connectivity: 110 kV, 220 kV, 410 kV  infrastructure, located 10 km from the nearest substation

  • Development Status: In Progress

Strategic Location & Infrastructure

Situated in Nikšić, one of Montenegro’s most favorable locations for renewable energy projects, Project MNE 4 benefits from a strong solar profile and direct access to major transmission lines (110 kV, 220 kV, 410 kV). This ensures efficient energy distribution and reliable grid integration.

The project has asphalt road access, facilitating logistics and construction. However, there is no connection to the municipal water supply, which may require additional infrastructure investments.

Investment Rationale

1. Expansion of Renewable Energy Capacity

Montenegro is actively working toward EU sustainability goals, creating a favorable investment climate for large-scale solar projects. Project MNE 4 aligns with national policies supporting renewable energy growth.

2. Long-Term Revenue Stability

  • 30-year secured land lease, reducing acquisition risks.

  • Opportunities for Power Purchase Agreements (PPAs) ensure stable returns over the project’s lifetime.

3. Optimized Photovoltaic Performance

  • High efficiency: 1,480.8 kWh/kWp specific PV output

  • Optimal module tilt: 38° for maximum energy absorption

  • Favorable climate conditions: An average temperature of 10.8°C minimizes system heat stress, ensuring long-term efficiency.

4. Grid & Infrastructure Readiness

  • Proximity to a strong grid infrastructure, ensuring seamless energy transmission.

  • Existing road access, enabling smooth development and operational logistics.

Project Development Status

  • Feasibility Study: Completed

  • Land Lease Agreements: Finalized

  • Urban-Technical Conditions: Fulfilled

  • Next Milestones: Permit acquisition and construction commencement

Why Invest in Project MNE 4?

Perun Energy is among Montenegro’s most reliable solar project developers, with expertise in navigating regulatory approvals, engineering challenges, and financial structuring. The company’s strong track record ensures that Project MNE 4 will be executed efficiently, maximizing return on investment.

Investors in Project MNE 4 will benefit from Montenegro’s growing energy demand, stable investment environment, and strong government support for renewables.

Investment & Partnership Opportunities

We welcome partners across various financing structures, including equity investment, co-development, and Power Purchase Agreements (PPAs). These models provide investors with long-term revenue stability and an entry point into Montenegro’s expanding renewable energy sector.

Contact Us

For investment inquiries, technical documentation, or financial projections, contact us at management@perun.energy for more details.

Average Monthly Weather Statistics

Climatic & Energy Yield Data

MonthDNI (kWh/m²)Temperature (°C)
January95.84.2
February1015.3
March1318.3
April125.512.1
May154.316.5
June185.220.4
July212.523.8
August190.323.1
September137.118.4
October122.513.2
November86.48.0
December86.54.9



Monthly Energy Production Data

Monthly Energy Output Projections

MonthExpected Energy Production (MWh)
January5,200
February5,600
March6,500
April6,200
May7,500
June8,800
July9,700
August9,100
September7,000
October6,500
November5,200
December4,900



Specifications

Technical Specifications

SpecificationDetails
Installed Capacity55 MW DC
Nominal Power Output49.1 MW AC
Estimated Energy Yield69.1 GWh
Elevation931 meters
Grid Voltage110 kV
Distance to Grid10 km
Lease Duration30 years