PROJECT Details

249 MW

project for installed solar power

Over 413 GWh

Annual Energy production

2.2 milion

square meter of land

Overview

Project MNE 2 is a large-scale solar photovoltaic power plant (PVPP) under development in Počekovići, Montenegro. Designed to deliver 249 MW of clean, renewable energy, this project represents a significant opportunity for investors seeking to participate in Montenegro’s rapidly expanding green energy sector.

Key Project Highlights

  • Installed Power: 249 MW DC
  • Expected Annual Energy Production: 316.3 GWh
  • Land Area: 2,242,402 m², with an option for expansion
  • Land Lease: Secured for 30 years
  • Elevation: 740 meters, optimal for solar energy generation
  • Solar Irradiation: 1,701.4 kWh/m²/year (In-plane irradiation)
  • Connection Voltage: 110 kV
  • Proximity to Grid: 8 km from Vilusi substation
  • Status: In Progress

Location

The project is strategically positioned in the Municipality of Nikšić, Montenegro’s emerging renewable energy hub. The site is located near three major transmission lines (110 kV, 220 kV, 410 kV) and benefits from road access and water supply infrastructure, reducing additional investment needs.

Investment Rationale

1. Growing Renewable Energy Market

Montenegro is rapidly advancing its renewable energy agenda, aligning with EU sustainability goals. With its first-mover advantage in Montenegro.

2. Long-Term Revenue Stability

  • 30-year secured land lease at an annual rate
  • Favorable energy pricing and potential Power Purchase Agreements (PPAs).

3. Optimized Solar Performance

  • High-efficiency yield: Specific PV output of 1,480.8 kWh/kWp
  • Optimal tilt: 36° angle ensures maximum solar absorption
  • Favorable climate conditions with an average temperature of 10.8°C, reducing panel overheating

4. Grid Accessibility and Infrastructure

  • Close proximity to a 110 kV grid connection, ensuring seamless integration into Montenegro’s power network.
  • Strong infrastructure with existing asphalt road access, water supply, and connectivity to local electrical networks.

Project Development Status

  • Feasibility Study: Completed
  • Land Lease Agreements: Signed with landowners
  • Urban-Technical Conditions: Completed
  • Next Steps: Securing construction permits and advancing to execution phase

Why Partner with Perun Energy?

Perun Energy is a leading developer in Montenegro’s green energy sector, specializing in large-scale solar energy projects. The company has sustainability-driven approach.

Investment Opportunities

Perun Energy welcomes investment partners to join the Project MNE 2 development. Whether as an equity investor, co-developer, or PPA off-taker, the project offers long-term financial returns in a rapidly growing market.

Contact Us

For investment inquiries, detailed financial projections, or partnership discussions, please contact us directly at management@perun.energy.

Average Monthly Weather Statistics

Average Monthly Weather Statistics

MonthDNI (kWh/m²)Temperature (°C)
January95.84.2
February1015.3
March1318.3
April125.512.1
May154.316.5
June185.220.4
July212.523.8
August190.323.1
September137.118.4
October122.513.2
November86.48.0
December86.54.9
Monthly Energy Production Data

Monthly Energy Production Data

MonthExpected Energy Production (MWh)
January18,500
February20,100
March26,100
April25,200
May30,900
June38,100
July42,300
August39,200
September29,200
October26,100
November19,000
December18,200
Specifications

Project Specifications

SpecificationDetails
Installed Power249 MW DC
Nominal Power217 MW AC
Annual Production316.3 GWh
Elevation740 meters
Grid Connection Voltage110 kV
Distance to Grid8 km
Land Lease Duration30 years

 